ACTi B55 Manual Page 17

  • Download
  • Add to my manuals
  • Print
  • Page
    / 28
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 16
www.acti.com
Hardware Manual
17
Mounting on the Ceiling or Wall
Step 1: Drill the Holes
IMPORTANT!
Before drilling the holes on the ceiling or wall, note the direction of the connectors side of the
camera, which is also the opposite side of the camera logo. This influences the camera
placement and where you should drill the hole where the cables will pass through or how the
cables will go along the ceiling or wall. When installing the camera on the wall, the
connectors side must either be facing up or down.
1. Attach the drill template on the target surface, drill the holes and attach the plastic plugs (if
necessary).
2. If the cables will pass through the ceiling or wall, drill also the cable hole at this point
and pull the cables through the hole on the ceiling or wall.
3. Remove the drill template sticker from the surface.
Connectors Side
Page view 16
1 2 ... 12 13 14 15 16 17 18 19 20 21 22 ... 27 28

Comments to this Manuals

No comments